NEW BRIDGE OVER THE MARA
Maroggia - 2021
In the spring of 2021, Tenconi SA undertook the construction of a new bridge over the Mara.
The existing bridge had to be replaced by a new one due to road rehabilitation issues aimed at ensuring optimal long-term mobility for the region.
Scope of supply: New metalwork as part of the refurbishment of the building's platform.
Technical characteristics
Width 12.75 m
Length 12.6 m
Total weight 67 t
Assembly by crane