NEW BRIDGE OVER THE MARA

Maroggia - 2021

 
 
 

In the spring of 2021, Tenconi SA undertook the construction of a new bridge over the Mara.

The existing bridge had to be replaced by a new one due to road rehabilitation issues aimed at ensuring optimal long-term mobility for the region.

Scope of supply: New metalwork as part of the refurbishment of the building's platform.

Technical characteristics

  • Width 12.75 m

  • Length 12.6 m

  • Total weight 67 t

  • Assembly by crane

 
Copy of Copy of Untitled.png

Client: State of Canton Ticino / Territory Department Construction Division

Project: New bridge over the Mara

Designer: Brenni engineering SA

Location: Municipality of Maroggia

Year: 2021